Title Image

Archive

Ballard Pool

Location: Seattle, WA ORB Architects (now Innova)   At the Ballard Pool, a retractable plastic cover was added to the swimming pool to save energy when the pool is not in use. The plastic cover connects to two 24-feet long rollers that are mounted high on the

Kenmore Camera

Location: Kenmore, WA ORB Architects (now Innova)   This existing 17,000 sq ft retail space was renovated to become the new home for Kenmore Camera. The Structural Engineering scope for this project included anchorage of the wood-framed roof to the exterior masonry walls, new interior partition walls, and

Reaney Spraypark

Location: Pullman, WA ORB Architects (now Innova)   For this new water park, Strong Work SE provided a structural review of the steel rebar layout and the concrete mix design for the concrete slab, concrete pool, and concrete benches.

Mountlake Terrace Therapy Pool

Location: Mountlake Terrace, WA Architect:  ORB Architects (now Innova)   For this new therapy pool, Strong Work SE provided a structural review of the steel rebar layout and the concrete mix design.

Plaza 17

Location: Auburn, WA Architect:  ORB Architects (now Innova)   The Plaza 17 facility is one of King County Housing Authority’s subsided housing facilities for the elderly.  At Auburn apartment building, the dated facade was replaced with a new, more inviting entry and front canopy.  Unique features include a

Munro Manor

Location: Burien, WA Architect:  ORB Architects (now Innova)   Munro Manor is one of King County Housing Authority’s subsided housing facilities for the elderly.  At this Burien apartment buidling, the dated facade was replaced with a new, more inviting entry.  In addition, the posts and beams supporting many

Riverton Terrace

Location: Tukwila, WA ORB Architects (now Innova)   Riverton Terrace is one of King County Housing Authority’s subsided housing facilities for the elderly.  At this Tukwila apartment building, the dated facade was replaced with a new, more inviting entry.  Unique features include a cantilevered wing wall and a

Khmer Cultural and Community Center

Location: Seattle, WA Utopia Design & Development   This 15,000 square foot building serves the hundreds of members of the Sahak Khemararam Buddhist Association. The upper level is the temple’s assembly area for worship, and the lower level provides gathering areas and offices for the Khmer community. Unique

Bitter Lake

Location: Seattle, WA Verge Architecture and Design   This Bitter Lake house received several major upgrades: a second floor addition, a seismic retro-fit of the first floor, an extension to the existing kitchen, and renovations of the first floor’s interior walls to create a more functional and

Sommerset Revonation

Location: Bellevue, WA Atelier Drome Architecture: www.atelierdrome.com   This Bellevue home received a new second floor, and a renovation of the entire first floor and the entire basement.  All of the interior finishes were replaced and many interior walls were relocated to create a new modern style.  At